A RECYCLING PLANT FOR CONTAINER AND PAPER COMMINGLED
WITH A CAPACITY OF 8 TONNES /HR


Click on the image for a larger view Click on the image for a larger view Click on the image for a larger view
Inground primary (infeed) conveyor. Paper - containers separating trommel. Containers sorting line.



T & A Australia redesigned the existing plant and implemented the upgraded plant by modifying the existing equipment and adding some new equipment. The downtime was 10 calendar days.

The main features:

the throughput capacity was doubled to 8 tonnes per hour

the sorting made into a continuous operation without down times for baling and bin change activities

the waste was reduced to less than 50% of the previous plant

the quality of paper increased to acceptable standards for the higher bracket of returns

the manning of the plant reduced to 70% of that of the previous plant